Replacement in Nazareth, PA
We worked in the town of Nazareth, PA on a replacement project for UGI Utilities direct burying 8″ HDPE pipe. This job was sawcut ahead of time and all gas services and main were found via vacuum excavation before trenching began. With this install we are uprating the system from LP (low pressure) to MP (medium pressure) 60 PSI. Our great crews in PA are hand digging to locate and spot a buried sewer lateral before machine excavation.